We didn't start taking pictures until we were well into the project, consequently this picture doesn't show the hideous dog-smellin' skanky carpet that I removed and the nasty 80's dark wood paneling that covered half the room (with no sheet rock behind) that I had to remove:
The insulation was only R7 so we added R13 on top since the wall was open.
This unflattering picture is here to illustrate that I had to correct some wiring that the previous owner had screwed up:
Another unflattering picture of sister Wendy (fellow congregant from Faith PCiT who is skilled in sheetrock and mud:
Before paint:
Sam Irwin the master painter:
The back door:
Finally we begin on the flooring:
The following three photos represent the completion of the flooring and molding (As of this post, I still have to trim out the electrical and install the molding for the windows.):
Subscribe to:
Post Comments (Atom)
2 comments:
Yes, I remember that room before. What an improvement! Must have been some work, that appears to be no small task.
Yes,
I suffered much (& so did others).
Jim.
Post a Comment